Results
16 result(s), displaying 1 to 12
Reinforcing the NSW Southern Shared Network (Humelink) RIT-T dispute
On 24 November 2021 the AER published a determination clause 5.16B of the National Energy Rules.
Type
RIT-T and RIT-D disputes
Status
Historical
TransGrid – Expanding Victoria-New South Wales transmission transfer capacity contingent project
Type
Contingent projects
Status
Open
TransGrid - Cost pass through - 2019–20 Bushfire season
On 13 November 2020, TransGrid submitted a cost pass through application seeking to recover costs in relation to the 2019-20 bushfires in New South Wales.
Type
Cost pass throughs
Status
Current
Murraylink connection charge pass through 2019–20
Murraylink connection charge pass through 2019–20
Type
Cost pass throughs
Status
Historical
Roma to Brisbane Pipeline - Annual tariff variation 2021-22
Type
Tariff variations
Status
Historical
TransGrid and ElectraNet – Project EnergyConnect contingent project
Type
Contingent projects
Status
Current
AusNet Services – Cost pass through – 500kV Transmission Line Tower Collapse
Type
Cost pass throughs
Status
Current
AusNet Services - Cost pass through - Easement land tax 2021–22
Type
Cost pass throughs
Status
Current
APA Victorian Transmission System - Annual tariff variation 2021
Type
Tariff variations
Status
Historical
Central Ranges Gas Pipeline (transmission) - Annual tariff variation 2018-19
Type
Tariff variations
Status
Historical
Roma to Brisbane Pipeline - Annual tariff variation 2018-19
Type
Tariff variations
Status
Historical