Results
7 result(s), displaying 1 to 7
Central Ranges Gas Pipeline (transmission) - Annual tariff variation 2016-17
Type
Tariff variations
Status
Historical
AusNet Services (Transmission) - Cost allocation method 2017
Type
Cost allocation methods
Status
Current
AusNet Services - Cost pass through - easement land tax 2016
Type
Cost pass throughs
Status
Historical
Amadeus Gas Pipeline - Access arrangement 2026–31
The AER will make a determination on the maximum amount of revenue that APA's Amadeus gas pipeline can earn from consumers over 1 July 2026 to 30 June 2031.
Type
Access arrangements
Status
Open