Results
18 result(s), displaying 1 to 12
TasNetworks North West Transmission Developments Stage 1 – Early Works Contingent Project
On 10 October 2024, TasNetworks submitted its contingent project application seeking to increase its revenue to fund early works on NWTD stage 1 early works.
Type
Contingent projects
Status
Open
Power and Water Corporation - Ring Fencing Decision - McArthur River Mining Pipeline
The AER has made a final decision to grant an exemption to Power and Water from their ring-fencing obligations for the McArthur River Mining Pipeline.
Type
Ring-fencing
Status
Current
Transgrid HumeLink contingent project stage 2
Transgrid HumeLink contingent project stage 2
Type
Contingent projects
Status
Current
Waratah Super Battery – Network augmentation and SIPS control system
Read our determination on the costs of the non-contestable Network augmentation and System Integrity Protection Scheme control system component of the WSB project.
Type
Determinations
Status
Current
TasNetworks - Network support pass through 2022-23
TasNetworks - Network support pass through 2022-23
Type
Cost pass throughs
Status
Current
ElectraNet - Network support pass through 2022–23
ElectraNet - Network support pass through 2022–23
Type
Cost pass throughs
Status
Current
Powerlink - Network support pass through 2022–23
Powerlink - Network support pass through 2022–23
Type
Cost pass throughs
Status
Current
Murraylink - Connection charge pass through 2022–23
The AER published its decision on a negative cost pass through application submitted by Murraylink to reduce its 2024-25 allowed revenue due to lower than forecast connection charges in 2022-23.
Type
Cost pass throughs
Status
Current
ElectraNet - Cost pass through - 2024–25 Inertia network service costs
On 22 March 2024, the AER published its decision on a negative inertia shortfall cost pass through application from ElectraNet.
Type
Cost pass throughs
Status
Current
Amadeus Gas Pipeline - 2024–25 tariff variation notice
Amadeus proposed new network prices to apply to its NT gas pipeline for 2024–25.
Type
Tariff variations
Status
Current
Roma to Brisbane Pipeline - 2024–25 tariff variation notice
Roma to Brisbane proposed new network prices to apply to its Qld gas pipeline for 2024–25.
Type
Tariff variations
Status
Current
Transgrid VNI West contingent project application stage 1 early works
Transgrid Victoria to NSW Interconnector West (VNI West) contingent project application stage 1 early works
Type
Contingent projects
Status
Current