Results
12 result(s), displaying 1 to 12
Energex and Ergon Energy - Regulatory accounts Ring-fencing waiver 2011
Type
Ring-fencing
Status
Historical
Ergon Energy - Photovoltaic installations ring-fencing waiver 2011
Type
Ring-fencing
Status
Historical
Victorian Advanced Metering Infrastructure (AMI) remote services charges 2011-12
Type
AMI charges
Status
Historical
Advanced Metering Infrastructure (AMI) - Bring forward service fee proposed by Citipower and Powercor
Type
AMI charges
Status
Historical
Australian Gas Networks (SA) - Access arrangement 2026-31
The AER will make a determination on the maximum amount of revenue that AGN(SA) can earn from consumers over the period 1 July 2026 to 30 June 2031.
Type
Access arrangements
Status
Open
Evoenergy - Access arrangement 2026-31
The AER will make a determination on the maximum amount of revenue that Evoenergy can earn from consumers over the period 1 July 2026 to 30 June 2031.
Type
Access arrangements
Status
Open