Results
21 result(s), displaying 1 to 12
APA Victorian Transmission System - 2025 tariff variation notice
APA Victorian Transmission System submitted to the AER an annual tariff variation notice for the period 1 January 2025 - 31 December 2025.
Type
Tariff variations
Status
Open
TasNetworks North West Transmission Developments Stage 1 – Early Works Contingent Project
On 10 October 2024, TasNetworks submitted its contingent project application seeking to increase its revenue to fund early works on NWTD stage 1 early works.
Type
Contingent projects
Status
Open
Power and Water Corporation - Ring Fencing Decision - McArthur River Mining Pipeline
The AER has made a final decision to grant an exemption to Power and Water from their ring-fencing obligations for the McArthur River Mining Pipeline.
Type
Ring-fencing
Status
Current
Murraylink - Connection charge pass through 2022–23
The AER published its decision on a negative cost pass through application submitted by Murraylink to reduce its 2024-25 allowed revenue due to lower than forecast connection charges in 2022-23.
Type
Cost pass throughs
Status
Current
ElectraNet - Cost pass through - 2024–25 Inertia network service costs
On 22 March 2024, the AER published its decision on a negative inertia shortfall cost pass through application from ElectraNet.
Type
Cost pass throughs
Status
Current
Amadeus Gas Pipeline - 2024–25 tariff variation notice
Amadeus proposed new network prices to apply to its NT gas pipeline for 2024–25.
Type
Tariff variations
Status
Current
Roma to Brisbane Pipeline - 2024–25 tariff variation notice
Roma to Brisbane proposed new network prices to apply to its Qld gas pipeline for 2024–25.
Type
Tariff variations
Status
Current
Transgrid - Ring-fencing waiver - Telecommunications services - April 2024
Transgrid seeking a waiver from transmission ring-fencing guideline to continue to own and operate 6 telecommunications services for a period of 12 months.
Type
Ring-fencing
Status
Current
AusNet Services - Cost pass through - Easement land tax 2024–25
AusNet Services - Cost pass through - Easement land tax 2024–25
Type
Cost pass throughs
Status
Current
Transgrid - Ring-fencing waiver (backup generation) - January 2024
Transgrid submitted a ring-fencing waiver application under clause 5.2 of the Electricity Transmission Ring-fencing Guideline.
Type
Ring-fencing
Status
Open
Victoria: December 2026 - February 2027
The Retailer Reliability Obligation (RRO) is designed to support reliability in the National Electricity Market (NEM).
Type
Retail Reliability Obligation
Status
Open
Victoria: December 2027 - March 2028
The AER will make a decision on a T-3 Reliability Instrument under the RRO for a forecast reliability gap in Victoria, from 1 December 2027 - 31 March 2028.
Type
Retail Reliability Obligation
Status
Current