Results
28 result(s), displaying 1 to 12
AusNet Services VEBM cost pass through application
AusNet Services Victorian Emergency Backstop Mechanism (VEBM) cost pass through application
Type
Cost pass throughs
Status
Current
APA Victorian Transmission System - 2025 tariff variation notice
APA Victorian Transmission System submitted to the AER an annual tariff variation notice for the period 1 January 2025 - 31 December 2025.
Type
Tariff variations
Status
Open
Power and Water Corporation - Ring Fencing Decision - McArthur River Mining Pipeline
The AER has made a final decision to grant an exemption to Power and Water from their ring-fencing obligations for the McArthur River Mining Pipeline.
Type
Ring-fencing
Status
Current
AusNet - Ring-fencing waiver (streamlined process) - November 2024
On 18 October 2024, AusNet submitted a waiver application under clause 5.2 of the Ring-fencing guideline (electricity distribution).
Type
Ring-fencing
Status
Current
Murraylink - Connection charge pass through 2022–23
The AER published its decision on a negative cost pass through application submitted by Murraylink to reduce its 2024-25 allowed revenue due to lower than forecast connection charges in 2022-23.
Type
Cost pass throughs
Status
Current
AusNet Services - 2024–25 pricing proposal
AusNet Services proposed new network prices to apply to its Victorian network for 2024–25.
Type
Pricing proposals
Status
Current
CitiPower - 2024–25 pricing proposal
CitiPower proposed new network prices to apply to its Victorian network for 2024–25.
Type
Pricing proposals
Status
Current
Jemena - 2024–25 pricing proposal
Jemena proposed new network prices to apply to its Victorian network for 2024–25.
Type
Pricing proposals
Status
Current
Powercor - 2024–25 pricing proposal
Powercor proposed new network prices to apply to its Victorian network for 2024–25.
Type
Pricing proposals
Status
Current
United Energy - 2024–25 pricing proposal
United Energy proposed new network prices to apply to its Victorian network for 2024–25.
Type
Pricing proposals
Status
Current
Multinet - 2024–25 tariff variation notice
Multinet proposed new network prices to apply to its Victorian gas network for 2024–25.
Type
Tariff variations
Status
Current
Amadeus Gas Pipeline - 2024–25 tariff variation notice
Amadeus proposed new network prices to apply to its NT gas pipeline for 2024–25.
Type
Tariff variations
Status
Current