Results
11 result(s), displaying 1 to 11
Murraylink - Connection charge pass through 2022–23
The AER published its decision on a negative cost pass through application submitted by Murraylink to reduce its 2024-25 allowed revenue due to lower than forecast connection charges in 2022-23.
Type
Cost pass throughs
Status
Current
ElectraNet - Cost pass through - 2024–25 Inertia network service costs
On 22 March 2024, the AER published its decision on a negative inertia shortfall cost pass through application from ElectraNet.
Type
Cost pass throughs
Status
Current
SA Power Networks - 2024–25 pricing proposal
SA Power Networks proposed new network prices to apply to its South Australian network for 2024–25.
Type
Pricing proposals
Status
Current
Australian Gas Networks (SA) - 2024–25 tariff variation notice
AGN proposed new network prices to apply to its SA gas network for 2024–25.
Type
Tariff variations
Status
Current
South Australia: January - March 2025
The Retailer Reliability Obligation (RRO) is designed to support reliability in the National Electricity Market (NEM).
Type
Retail Reliability Obligation
Status
Revoked
SA Power Networks - Ring fencing waiver - Market Active Solar Trial - January 2024
SA Power Networks has submitted a waiver application under provision 4.2 of the Ring-fencing Guideline (Electricity distribution)
Type
Ring-fencing
Status
Open
South Australia: January - March 2028
On 2 January 2025, the South Australia Minister for Energy and Mining triggered the RRO in South Australia for the first quarter of 2028.
Type
Retail Reliability Obligation
Status
Open
Ring-fencing guideline (electricity transmission) 2025
The AER has released version 5 of the ring-fencing guideline for electricity transmission.
Type
Ring-fencing
Status
Current
Ring-fencing guideline (electricity distribution) 2025
The AER has released version 4 of the ring-fencing guideline for electricity distribution.
Type
Ring-fencing
Status
Current
Australian Gas Networks (SA) - Access arrangement 2026-31
The AER will make a determination on the maximum amount of revenue that AGN(SA) can earn from consumers over the period 1 July 2026 to 30 June 2031.
Type
Access arrangements
Status
Open
ElectraNet - Network support pass through 2023–24
AER’s has determined ElectraNet's 2023-24 positive network support cost pass through should be reflected in ElectraNet's maximum allowed revenue for 2023-28
Type
Cost pass throughs
Status
Current