Results
18 result(s), displaying 1 to 12
Transgrid HumeLink contingent project stage 2
Transgrid HumeLink contingent project stage 2
Type
Contingent projects
Status
Current
Waratah Super Battery – Network augmentation and SIPS control system
Read our determination on the costs of the non-contestable Network augmentation and System Integrity Protection Scheme control system component of the WSB project.
Type
Determinations
Status
Current
TasNetworks - Network support pass through 2022-23
TasNetworks - Network support pass through 2022-23
Type
Cost pass throughs
Status
Current
ElectraNet - Network support pass through 2022–23
ElectraNet - Network support pass through 2022–23
Type
Cost pass throughs
Status
Current
Powerlink - Network support pass through 2022–23
Powerlink - Network support pass through 2022–23
Type
Cost pass throughs
Status
Current
Transgrid VNI West contingent project application stage 1 early works
Transgrid Victoria to NSW Interconnector West (VNI West) contingent project application stage 1 early works
Type
Contingent projects
Status
Current
NSW Electricity Infrastructure Roadmap - contribution determination 2024−25
View our decision on the maximum amount electricity distributors can pass through to consumers in 2024-25 as costs for the NSW infrastructure roadmap.
Type
Cost pass throughs
Status
Current
Victoria to NSW Interconnector West (VNI West) RIT-T dispute
On 16 October 2023 the AER published a determination clause 5.16B of the National Electricity Rules.
Type
RIT-T and RIT-D disputes
Status
Historical
Transgrid - Humelink early works contingent project - stage 1 part 2
The AER's decision in relation to Transgrid's Humelink stage 1 part 2 contingent project application.
Type
Contingent projects
Status
Current
Transgrid - Cost Allocation Method 2023
TransGrid's cost allocation methodology (CAM) governs the manner in which TransGrid is allowed to allocate costs to the transmission services it provides.
Type
Cost allocation methods
Status
Current
AusNet Services - Cost pass through - Easement land tax 2023–24
Type
Cost pass throughs
Status
Current
Murraylink - Determination 2023–28
Murraylink's current electricity transmission determination applies from 1 July 2023 to 30 June 2028.
Type
Determinations
Status
Current