Results
17 result(s), displaying 1 to 12
Transgrid HumeLink contingent project stage 2
Transgrid HumeLink contingent project stage 2
Type
Contingent projects
Status
Current
Waratah Super Battery – Network augmentation and SIPS control system
Read our determination on the costs of the non-contestable Network augmentation and System Integrity Protection Scheme control system component of the WSB project.
Type
Determinations
Status
Current
Transgrid VNI West contingent project application stage 1 early works
Transgrid Victoria to NSW Interconnector West (VNI West) contingent project application stage 1 early works
Type
Contingent projects
Status
Current
NSW Electricity Infrastructure Roadmap - contribution determination 2024−25
View our decision on the maximum amount electricity distributors can pass through to consumers in 2024-25 as costs for the NSW infrastructure roadmap.
Type
Cost pass throughs
Status
Current
Essential Energy - Ring-fencing waiver - training services
Essential Energy submitted a ring-fencing waiver application under clause 5.2 of the Electricity Distribution Ring-fencing Guideline.
Type
Ring-fencing
Status
Open
Essential Energy - Ring-fencing waiver - November 2023
Essential Energy waiver for its Water supply business in regional NSW - November 2023
Type
Ring-fencing
Status
Current
Victoria to NSW Interconnector West (VNI West) RIT-T dispute
On 16 October 2023 the AER published a determination clause 5.16B of the National Electricity Rules.
Type
RIT-T and RIT-D disputes
Status
Historical
Transgrid - Humelink early works contingent project - stage 1 part 2
The AER's decision in relation to Transgrid's Humelink stage 1 part 2 contingent project application.
Type
Contingent projects
Status
Current
Ausgrid - Annual pricing 2023–24
Ausgrid submitted to the AER an annual pricing proposal for its New South Wales distribution network for the period 1 July 2023 to 30 June 2024.
Type
Pricing proposals
Status
Historical
Endeavour Energy - Annual pricing 2023–24
Endeavour Energy submitted to the AER an annual pricing proposal for its New South Wales distribution network for the period 1 July 2023 to 30 June 2024.
Type
Pricing proposals
Status
Historical
Essential Energy - Annual pricing 2023–24
Essential Energy submitted to the AER an annual pricing proposal for its New South Wales distribution network for the period 1 July 2023 to 30 June 2024.
Type
Pricing proposals
Status
Historical
Transgrid - Cost Allocation Method 2023
TransGrid's cost allocation methodology (CAM) governs the manner in which TransGrid is allowed to allocate costs to the transmission services it provides.
Type
Cost allocation methods
Status
Current