Waratah Super Battery – Network augmentation and SIPS control system
Read our determination on the costs of the non-contestable Network augmentation and System Integrity Protection Scheme control system component of the WSB project.
Type
Determinations
Status
Current
Australian Gas Networks (Victoria and Albury) - Access arrangement 2023–28
On 2 June 2023, we released our final decision on AGN’s access arrangement review for the 2023–28 period.
Type
Access arrangements
Status
Current
Waratah Super Battery - Paired generation services
Read our determination on the amounts to be paid to Transgrid for the paired generation service component of the WSB project.
Type
Determinations
Status
Current
Jemena Gas Networks (NSW) - Access arrangement 2025–30
The AER will make a determination on the maximum amount of revenue that Jemena Gas Networks can earn from consumers over the period 1 July 2025 to 30 June 2030.