Results
6 result(s), displaying 1 to 6
Victoria to NSW Interconnector West (VNI West) RIT-T dispute
On 16 October 2023 the AER published a determination clause 5.16B of the National Electricity Rules.
Type
RIT-T and RIT-D disputes
Status
Historical
Transgrid - Humelink early works contingent project - stage 1 part 2
The AER's decision in relation to Transgrid's Humelink stage 1 part 2 contingent project application.
Type
Contingent projects
Status
Current
Amadeus Gas Pipeline - Annual tariff variation 2023–24
Amadeus Gas Pipeline submitted to the AER an annual tariff variation notice for the period 1 July 2023 - 30 June 2024.
Type
Tariff variations
Status
Historical
Roma to Brisbane Pipeline - Annual tariff variation 2023–24
APA Group submitted to the AER an annual tariff variation notice for its Queensland gas transmission network for the period 1 July 2023 to 30 June 2024.
Type
Tariff variations
Status
Historical
Transgrid - Cost Allocation Method 2023
TransGrid's cost allocation methodology (CAM) governs the manner in which TransGrid is allowed to allocate costs to the transmission services it provides.
Type
Cost allocation methods
Status
Current
AusNet Services - Cost pass through - Easement land tax 2023–24
Type
Cost pass throughs
Status
Current