Results
98 result(s), displaying 1 to 12
AusNet Services VEBM cost pass through application
AusNet Services Victorian Emergency Backstop Mechanism (VEBM) cost pass through application
Type
Cost pass throughs
Status
Current
TasNetworks North West Transmission Developments Stage 1 – Early Works Contingent Project
On 10 October 2024, TasNetworks submitted its contingent project application seeking to increase its revenue to fund early works on NWTD stage 1 early works.
Type
Contingent projects
Status
Open
AusNet - Ring-fencing waiver (streamlined process) - November 2024
On 18 October 2024, AusNet submitted a waiver application under clause 5.2 of the Ring-fencing guideline (electricity distribution).
Type
Ring-fencing
Status
Current
Origin Retailer of Last Resort Cost Recovery Applications
The AER has approved Origin Energy's six cost recovery applications for costs incurred as the Retailer of Last Resort for retailer failures in 2022.
Type
Cost pass throughs
Status
Current
Ergon Energy Network - Ring-fencing waiver - Card Operated Meters - September 2024
On 3 May 2024, Ergon Energy Network submitted an application for a waiver from clauses 3.1(b) and 4.2.3 of the Ring-fencing Guideline.
Type
Ring-fencing
Status
Current
Ergon Energy - Ring-fencing waiver - Behind the meter - August 2024
Ergon Energy waiver to install, own, operate and maintain distributed energy resources behind participating customers’ meters in isolated networks in Queensland
Type
Ring-fencing
Status
Current
Transgrid HumeLink contingent project stage 2
Transgrid HumeLink contingent project stage 2
Type
Contingent projects
Status
Current
Waratah Super Battery – Network augmentation and SIPS control system
Read our determination on the costs of the non-contestable Network augmentation and System Integrity Protection Scheme control system component of the WSB project.
Type
Determinations
Status
Current
TasNetworks - Network support pass through 2022-23
TasNetworks - Network support pass through 2022-23
Type
Cost pass throughs
Status
Current
ElectraNet - Network support pass through 2022–23
ElectraNet - Network support pass through 2022–23
Type
Cost pass throughs
Status
Current
Powerlink - Network support pass through 2022–23
Powerlink - Network support pass through 2022–23
Type
Cost pass throughs
Status
Current
SA Power Networks - Cost pass through - 2022-23 River Murray flood event
On 24 March 2024, the AER published its decision on a cost pass through application from SA Power Networks, seeking to recover costs incurred responding to the 2022-23 River Murray flood event.
Type
Cost pass throughs
Status
Current