Results
22 result(s), displaying 1 to 12
AusNet Services - Cost pass through - 2019–20 bushfire natural disaster
Type
Cost pass throughs
Status
Current
TransGrid – Expanding Victoria-New South Wales transmission transfer capacity contingent project
Type
Contingent projects
Status
Open
Murraylink connection charge pass through 2019–20
Murraylink connection charge pass through 2019–20
Type
Cost pass throughs
Status
Historical
CitiPower, Powercor, United Energy - Cost Allocation Method 2020
Type
Cost allocation methods
Status
Current
AusNet Services – Cost pass through – 500kV Transmission Line Tower Collapse
Type
Cost pass throughs
Status
Current
AusNet Services - Annual pricing 2021
On 11 November 2020, the AER approved AusNet Services' annual pricing proposal for the period 1 January 2021 to 30 June 2021.
Type
Pricing proposals
Status
Historical
CitiPower - Annual pricing 2021
On 11 November 2020, the AER approved CitiPower's annual pricing proposal for the period 1 January 2021 to 30 June 2021.
Type
Pricing proposals
Status
Historical
Jemena - Annual pricing 2021
On 11 November 2020, the AER approved Jemena's annual pricing proposal for the period 1 January 2021 to 30 June 2021.
Type
Pricing proposals
Status
Historical
Powercor - Annual pricing 2021
On 11 November 2020, the AER approved Powercor's annual pricing proposal for the period 1 January 2021 to 30 June 2021.
Type
Pricing proposals
Status
Historical
United Energy - Annual pricing 2021
On 11 November 2020, the AER approved United Energy's annual pricing proposal for the period 1 January 2021 to 30 June 2021.
Type
Pricing proposals
Status
Historical
Australian Gas Networks (Victoria and Albury) - Annual tariff variation 2021
Type
Tariff variations
Status
Historical