Results
14 result(s), displaying 1 to 12
Murraylink connection charge pass through 2019–20
Murraylink connection charge pass through 2019–20
Type
Cost pass throughs
Status
Historical
TransGrid and ElectraNet – Project EnergyConnect contingent project
Type
Contingent projects
Status
Current
Australian Gas Networks (SA) - Annual tariff variation 2020-21
Type
Tariff variations
Status
Historical
South Australia: January - February 2024
On 12 March 2024, AEMO notified the AER that there were no compliance trading intervals during the 8 Janaury-29 February 2024 reliability gap period in South Australia. This notice brings this reliability instrument to a close.
Type
Retail Reliability Obligation
Status
Historical