Murraylink - Connection charge pass through 2022–23
The AER published its decision on a negative cost pass through application submitted by Murraylink to reduce its 2024-25 allowed revenue due to lower than forecast connection charges in 2022-23.
Type
Cost pass throughs
Status
Current
ElectraNet - Cost pass through - 2024–25 Inertia network service costs
On 22 March 2024, the AER published its decision on a negative inertia shortfall cost pass through application from ElectraNet.
Type
Cost pass throughs
Status
Current
SA Power Networks - 2024–25 pricing proposal
SA Power Networks proposed new network prices to apply to its South Australian network for 2024–25.
Type
Pricing proposals
Status
Current
Australian Gas Networks (SA) - 2024–25 tariff variation notice
AGN proposed new network prices to apply to its SA gas network for 2024–25.
Type
Tariff variations
Status
Current
ElectraNet - SA Energy Transformation regulatory investment test for transmission (RIT-T)
Type
Contingent projects
Status
Current
ElectraNet - Main grid system strength contingent project
On 9 August 2019, the AER made a final decision in relation to ElectraNet's main grid system strength contingent project application.
Type
Contingent projects
Status
Current
Australian Gas Networks (SA) - Annual tariff variation 2019-20
Type
Pricing proposals
Status
Historical
SA Energy Transformation RIT-T dispute
On 5 June 2019 the AER published a determination clause 5.16B of the National Electricity Rules.
Type
RIT-T and RIT-D disputes
Status
Historical
ElectraNet – Cost pass through – extension of time limit to submit 2019 application
Type
Cost pass throughs
Status
Current
ElectraNet - Economic evaluation - Main grid system strength project (contingent project trigger)
Type
Contingent projects
Status