Results
93 result(s), displaying 37 to 48
ElectraNet – Cost pass through – extension of time limit to submit 2019 application
Type
Cost pass throughs
Status
Current
AusNet Services - Cost pass through - Easement land tax 2019–20
Type
Cost pass throughs
Status
Current
ElectraNet - Economic evaluation - Main grid system strength project (contingent project trigger)
Type
Contingent projects
Status
Current
TransGrid - Cost allocation method 2017
Transgrid's Cost Allocation Method (2017) was superceeded in May 2023.
Type
Cost allocation methods
Status
Historical
Australian Gas Networks (Albury) - Annual tariff variation 2017
Type
Tariff variations
Status
Historical