ElectraNet - SA Energy Transformation regulatory investment test for transmission (RIT-T)
Type
Contingent projects
Status
Current
ElectraNet - Main grid system strength contingent project
On 9 August 2019, the AER made a final decision in relation to ElectraNet's main grid system strength contingent project application.
Type
Contingent projects
Status
Current
Australian Gas Networks (SA) - Annual tariff variation 2019-20
Type
Pricing proposals
Status
Historical
SA Energy Transformation RIT-T dispute
On 5 June 2019 the AER published a determination clause 5.16B of the National Electricity Rules.
Type
RIT-T and RIT-D disputes
Status
Historical
ElectraNet – Cost pass through – extension of time limit to submit 2019 application
Type
Cost pass throughs
Status
Current
ElectraNet - Economic evaluation - Main grid system strength project (contingent project trigger)
Type
Contingent projects
Status
Current
Murraylink - Determination 2018-23
Murraylink's electricity transmission determination for the period 1 July 2018 to 30 June 2023
Type
Determinations
Status
Historical
ElectraNet - Determination 2018-23
ElectraNet's electricity transmission determination for the period 1 July 2018 to 30 June 2023
Type
Determinations
Status
Historical