Results
26 result(s), displaying 1 to 12
Transgrid HumeLink contingent project stage 2
Transgrid HumeLink contingent project stage 2
Type
Contingent projects
Status
Current
Waratah Super Battery – Network augmentation and SIPS control system
Read our determination on the costs of the non-contestable Network augmentation and System Integrity Protection Scheme control system component of the WSB project.
Type
Determinations
Status
Current
TasNetworks - Network support pass through 2022-23
TasNetworks - Network support pass through 2022-23
Type
Cost pass throughs
Status
Current
ElectraNet - Network support pass through 2022–23
ElectraNet - Network support pass through 2022–23
Type
Cost pass throughs
Status
Current
Powerlink - Network support pass through 2022–23
Powerlink - Network support pass through 2022–23
Type
Cost pass throughs
Status
Current
Transgrid VNI West contingent project application stage 1 early works
Transgrid Victoria to NSW Interconnector West (VNI West) contingent project application stage 1 early works
Type
Contingent projects
Status
Current
NSW Electricity Infrastructure Roadmap - contribution determination 2024−25
View our decision on the maximum amount electricity distributors can pass through to consumers in 2024-25 as costs for the NSW infrastructure roadmap.
Type
Cost pass throughs
Status
Current
APA Victorian Transmission System - Annual tariff variation 2024
APA Victorian Transmission System submitted to the AER an annual tariff variation notice for the period 1 January 2024 - 31 December 2024.
Type
Tariff variations
Status
Current
Victoria to NSW Interconnector West (VNI West) RIT-T dispute
On 16 October 2023 the AER published a determination clause 5.16B of the National Electricity Rules.
Type
RIT-T and RIT-D disputes
Status
Historical
Transgrid - Humelink early works contingent project - stage 1 part 2
The AER's decision in relation to Transgrid's Humelink stage 1 part 2 contingent project application.
Type
Contingent projects
Status
Current
Amadeus Gas Pipeline - Annual tariff variation 2023–24
Amadeus Gas Pipeline submitted to the AER an annual tariff variation notice for the period 1 July 2023 - 30 June 2024.
Type
Tariff variations
Status
Historical
Roma to Brisbane Pipeline - Annual tariff variation 2023–24
APA Group submitted to the AER an annual tariff variation notice for its Queensland gas transmission network for the period 1 July 2023 to 30 June 2024.
Type
Tariff variations
Status
Historical