TransGrid - Expanding NSW-QLD Transmission Transfer Capacity regulatory investment test - transmission (RIT-T)
Type
Contingent projects
Status
Current
ElectraNet - SA Energy Transformation regulatory investment test for transmission (RIT-T)
Type
Contingent projects
Status
Current
TasNetworks - Cost pass through - extension of time to submit application
Type
Cost pass throughs
Status
Current
APA Victorian Gas Transmission System - Annual tariff variation 2020
Type
Tariff variations
Status
Historical
AusNet Services (Transmission) - Cost allocation method 2019
Type
Cost allocation methods
Status
Current
ElectraNet - Main grid system strength contingent project
On 9 August 2019, the AER made a final decision in relation to ElectraNet's main grid system strength contingent project application.
Type
Contingent projects
Status
Current
Roma to Brisbane Pipeline - Annual tariff variation 2019-20
Type
Pricing proposals
Status
Historical
SA Energy Transformation RIT-T dispute
On 5 June 2019 the AER published a determination clause 5.16B of the National Electricity Rules.
Type
RIT-T and RIT-D disputes
Status
Historical
ElectraNet – Cost pass through – extension of time limit to submit 2019 application
Type
Cost pass throughs
Status
Current
AusNet Services - Cost pass through - Easement land tax 2019–20
Type
Cost pass throughs
Status
Current