Results
9 result(s), displaying 1 to 9
Murraylink connection charge pass through 2019–20
Murraylink connection charge pass through 2019–20
Type
Cost pass throughs
Status
Historical
TransGrid and ElectraNet – Project EnergyConnect contingent project
Type
Contingent projects
Status
Current
Australian Gas Networks (SA) - Annual tariff variation 2020-21
Type
Tariff variations
Status
Historical
South Australia: January - March 2023
On 9 January 2020, the South Australia Minister for Energy and Mining triggered the RRO in South Australia for the first quarter of 2023.
Type
Retail Reliability Obligation
Status
Revoked