Results
68 result(s), displaying 37 to 48
Jemena Gas Networks (NSW) - Annual tariff variation 2023–24
Jemena submitted to the AER an annual tariff variation notice for its New South Wales gas distribution network for the period 1 July 2023 to 30 June 2024.
Type
Tariff variations
Status
Historical
Australian Gas Networks (SA) - Annual tariff variation 2023–24
Australian Gas Networks submitted to the AER an annual tariff variation notice for its South Australian gas distribution network for the period 1 July 2023 to 3
Type
Tariff variations
Status
Historical
Amadeus Gas Pipeline - Annual tariff variation 2023–24
Amadeus Gas Pipeline submitted to the AER an annual tariff variation notice for the period 1 July 2023 - 30 June 2024.
Type
Tariff variations
Status
Historical
Roma to Brisbane Pipeline - Annual tariff variation 2023–24
APA Group submitted to the AER an annual tariff variation notice for its Queensland gas transmission network for the period 1 July 2023 to 30 June 2024.
Type
Tariff variations
Status
Historical
Transgrid - Cost Allocation Method 2023
TransGrid's cost allocation methodology (CAM) governs the manner in which TransGrid is allowed to allocate costs to the transmission services it provides.
Type
Cost allocation methods
Status
Current
AusNet Services - Cost pass through - Easement land tax 2023–24
Type
Cost pass throughs
Status
Current
Endeavour Energy - Ring-fencing waiver (streamlined process) - February 2023
Type
Ring-fencing
Status
Current
Murraylink - Determination 2023–28
Murraylink's current electricity transmission determination applies from 1 July 2023 to 30 June 2028.
Type
Determinations
Status
Current
ElectraNet - Determination 2023–28
ElectraNet's current electricity transmission determination applies from 1 July 2023 to 30 June 2028.
Type
Determinations
Status
Current
Marinus Link - Determination 2025-28 - Stage 1, Part A (Early works)
The AER’s role is to review the reasonableness of the proposed costs of the Marinus Link interconnector to ensure consumers pay no more than necessary.
Type
Determinations
Status
Open
AusNet Services - Access arrangement 2023–28
On 2 June 2023, the AER released our final decision on AusNet’s access arrangement review for the 2023–28 period.
Type
Access arrangements
Status
Current
Australian Gas Networks (Victoria and Albury) - Access arrangement 2023–28
On 2 June 2023, we released our final decision on AGN’s access arrangement review for the 2023–28 period.
Type
Access arrangements
Status
Current