Results
16 result(s), displaying 1 to 12
TransGrid - Cost allocation method 2017
Transgrid's Cost Allocation Method (2017) was superceeded in May 2023.
Type
Cost allocation methods
Status
Historical
Australian Gas Networks (Albury) - Annual tariff variation 2017
Type
Tariff variations
Status
Historical
Jemena Gas Networks - Cost pass through - unpaid distribution charges
Type
Cost pass throughs
Status
Current
Jemena Gas Networks (NSW) - Annual tariff variation 2016-17
Type
Tariff variations
Status
Historical
Central Ranges Gas Network (distribution) - Annual tariff variation 2016-17
Type
Tariff variations
Status
Historical
Central Ranges Gas Pipeline (transmission) - Annual tariff variation 2016-17
Type
Tariff variations
Status
Historical
Ausgrid - Cost pass through - extension of time limit to submit 2016 application
Type
Cost pass throughs
Status
Current
Endeavour Energy - Cost pass through - extension of time limit to submit 2016 application
Type
Cost pass throughs
Status
Current
Essential Energy - Cost pass through - extension of time limit to submit 2016 application
Type
Cost pass throughs
Status
Current