Use the search bar to do a keyword search on an open consultation.
Results
11 result(s), displaying 1 to 11
AusNet Services’ cost pass through application – January 2026 bushfires
AusNet submitted a cost pass through application to recover costs incurred due to the January 2026 bushfires in Victoria. Submissions close 9 July 2026.
Type
Cost pass throughs
Status
Open
Rate of Return Instrument 2026
The Rate of Return Instrument specifies how the AER will determine the allowed rate of return on capital invested in regulated electricity and gas networks.
Type
Guidelines
Status
Open
Retail guidelines review
We are reviewing the Benefit Change Notice Guidelines, Better Bills Guideline, Customer Hardship Policy Guideline and Retail Pricing Information Guidelines.
Type
Reviews
Status
Open
Energex - Determination 2025–30
Energex electricity revenue determination for the 2025–30 period.
Type
Determinations
Status
Current
Essential Energy - Ring-fencing waiver - Kerbside EV charging infrastructure
Consultation opens on Essential Energy’s ring-fencing waiver application for providing kerbside EV charging infrastructure
Type
Ring-fencing
Status
Open
Ergon Energy - Determination 2025–30
Ergon Energy electricity revenue determination for the 2025–30 period
Type
Determinations
Status
Current
AusNet Gas Services - Access arrangement 2028–33
Gas access arrangement for AusNet Gas Services for the 2028–33 regulatory control period
Type
Access arrangements
Status
Open
Australian Gas Networks (Victoria and Albury) - Access arrangement 2028–33
Gas access arrangement for Australian Gas Networks (Victoria and Albury) for the 2028–33 regulatory control period
Type
Access arrangements
Status
Open
Multinet Gas Networks - Access arrangement 2028–33
Gas access arrangement for Multinet Gas for the 2028–33 regulatory control period
Type
Access arrangements
Status
Open